Inspection fixes in East Bench

Tom Hanks, owner, 24/7 Express Handyman Service · Updated September 2026

24/7 Express Handyman Service clears inspection lists in East Bench. 4.5 million emergency department visits a year in the U.S. are due to falls by older people. (Facts About Older Adult Falls | CDC) 77% of housing in Salt Lake City's East Bench community was owner-occupied as of the 2010 Census, compared with 49.7% citywide. (East Bench Master Plan (Salt Lake City Planning Division, 2017)) In the Salt Lake City & Millcreek zone, the dispatch fee is $199–$349 by time of day, due on arrival and covering the first 60 minutes on site; typical arrival is 60–90 minutes.

How much does an inspection fixes job cost in East Bench?

Inspection fixes in East Bench is billed as a same-day call-out: a dispatch fee by time of day that covers the first 60 minutes on site ($199 daytime (7 a.m.–6 p.m. weekdays), $249 evenings and weekends (6–10 p.m., and all day Saturday and Sunday), $299 overnight (10 p.m.–7 a.m.), $349 holidays and declared storm nights (federal holidays, and storm nights announced before the storm)), then $150/hour in 30-minute steps, plus the $50 supplies fee and the $15 fuel surcharge. Example: a handrail added and 2 trip hazards fixed on a weekday afternoon, about 2 hours: $414.

  • Example: a handrail added and 2 trip hazards fixed on a weekday afternoon, about 2 hours$414Estimate this job
  • Example: 1 loose step fixed on a weekday evening, about 1 hour$314Estimate this job

See the full price sheet and estimate your own job

Call now

Salt Lake City & Millcreek

(801) 999-0827Text photos

Answered 24/7 by Tom or his dispatcher.

Dispatch fee $199–$349 by time of day, due on arrival, covering the first hour on site. After that, $150/hour in 30-minute steps. Fuel surcharge $15. Supplies fee $50. Full price sheet and estimator

Typical arrival in the Salt Lake City & Millcreek zone: 60–90 minutes.

24/7 Express Handyman Service confirms the address, the zone rate and the dispatch fee, and takes a card, before rolling.

In East Bench

Development in the East Bench neighborhood is relatively young and suburban, with larger lots and homes, curving streets and an abundance of cul-de-sacs, a pattern shaped by the steepness of its location on the slope of the foothills. (East Bench Master Plan (Salt Lake City Planning Division, 2017)) Approximately one-third of East Bench neighborhoods developed prior to World War II. (East Bench Master Plan (Salt Lake City Planning Division, 2017)) A scenario magnitude 7 earthquake is estimated to produce an average fault scarp height of 6.1 feet where faulting occurs along the East Bench, enough displacement to cause irreparable damage to any structure built across the scarp. (Maps Show Potential Geologic Effects of a Magnitude 7 Earthquake | Utah Geological Survey) In a scenario magnitude 7 earthquake, landsliding would likely be most severe on Wasatch Range mountain spurs, threatening downslope development such as the East Bench, although prehistoric landslide deposits on these slopes are relatively rare. (Maps Show Potential Geologic Effects of a Magnitude 7 Earthquake | Utah Geological Survey) Salt Lake City's wildland urban interface code adds fire safety rules for properties near undeveloped natural areas, covering building and roofing materials, how buildings are built, landscaping, and the space required between buildings and wildland. (SLC Wildland Urban Interface Fire Code | Salt Lake City Council Office)

Calls come from around Foothill Drive, Parley's Way, Bonneville Shoreline Trail.

County
Salt Lake County
ZIP codes
84108, 84109
Zone and typical arrival
Salt Lake City & Millcreek: 60–90 minutes
Narrow wooden staircase with a wooden handrail in an old house
Photo: Ruhrfisch, CC BY-SA 4.0

What 24/7 Express Handyman Service does on site

  • Loose handrails and guardrails re-anchored, wobbly steps tightened, and trip hazards like lifted thresholds and loose deck boards fixed
  • Smoke alarm batteries replaced, expired battery-powered alarms swapped, and missing door stops, caulk and small patches handled
  • Each item on the list sorted into handyman work, licensed-trade work, and items that need photos as proof of completion

How it works

  1. Send the inspection list and the deadline date so every item can be sorted before anyone starts
  2. Fix the carpentry, hardware and safety items in order of what the deadline depends on
  3. Photograph each item before and after so the finished list can be sent on
  4. Referred out: electrical, plumbing, gas, heating and roofing items go to licensed trades, and peeling paint in a pre-1978 home beyond 6 sq ft per room inside or 20 sq ft outside goes to an EPA RRP-certified firm

What happens next

  • The written scope and price come first; nothing is started until you approve it, and the work is lined up around your deadline.
  • Photograph the damage before anything is moved and keep every receipt; 24/7 Express Handyman Service provides an itemised invoice your insurer may ask for. The dispatch fee and job cost are paid by you on the day.

More about inspection fixes

Every job 24/7 Express Handyman Service takes on is under $3,000 including labor, materials and any change orders (Utah Code §58-55-305); a change that would push a job over that line is referred to a licensed contractor, not written up as a second job. plumbing, electrical, HVAC, gas appliance / combustion system work is referred to a licensed trade.

Sources

All sources

Water still coming? Door that won't lock?

(801) 999-0827

Answered 24/7 by Tom or his dispatcher. 24/7 Express Handyman Service confirms the address, the zone rate and the dispatch fee, and takes a card, before rolling.

Call (801) 999-0827Text

Answered 24/7 by Tom or his dispatcher.