Board up a broken window in Midway
Tom Hanks, owner, 24/7 Express Handyman Service · Updated September 2026
24/7 Express Handyman Service boarded up a broken window in Midway. 7/16-inch wood panels are the thinnest one hurricane-region building code accepts for covering window openings. (Requirements for Attaching Plywood for Window Protection - Pinellas County) 5,590 feet is the elevation of Midway's nearest official climate station, in Heber City about three miles away, whose 1991-2020 climate normals record a January average low temperature of 12.5 degrees Fahrenheit and 21.5 inches of average January snowfall, with at least an inch of new snow falling on about 7 days in a typical January. (NOAA NCEI U.S. Climate Normals 1991-2020 (Monthly) — Heber, UT) In the Heber Valley & Wasatch County zone, scheduled work is $95/hour with a 2-hour minimum and no dispatch fee, plus a $35 fuel surcharge.
How much does a window board-up job cost in Midway?
From $225
Window board-up in Midway starts at $225: the 2-hour minimum at $95/hour ($190) plus the $35 fuel surcharge, with no dispatch fee. Time past 2 hours is billed in 30-minute steps. Larger parts are billed at cost plus 25%.
Call now
Heber Valley & Wasatch CountyAnswered 24/7 by Tom or his dispatcher.
Dispatch fee $249–$399 by time of day, due on arrival, covering the first hour on site. After that, $175/hour in 30-minute steps. Fuel surcharge $35. Supplies fee $50. Full price sheet and estimator
Typical arrival in the Heber Valley & Wasatch County zone: 60–90 minutes. Mountain passes close in heavy snow; the dispatcher gives a live estimate before rolling.
24/7 Express Handyman Service confirms the address, the zone rate and the dispatch fee, and takes a card, before rolling.

What 24/7 Express Handyman Service does on site
- Clearing loose glass shards from the sash, frame and sill so the opening can be covered safely.
- Cutting exterior-grade plywood or OSB to overlap the opening and screwing it into the framing around the window.
- Sealing the panel edges or adding plastic sheeting inside so rain, snow and drafts stay out until new glass goes in.
How it works
- Photograph the damage for your records, then remove loose glass from the frame.
- Measure the opening and cut a panel that overlaps solid framing on every side.
- Screw the panel into the framing, not just the trim, and seal the edges against weather.
- Referred out: insulated glass units and full window replacement go to a glass or window company.
What happens next
- The written scope and price come first; the panel stays up until the replacement glass or window is installed.
- Photograph the damage before anything is moved and keep every receipt; 24/7 Express Handyman Service provides an itemised invoice your insurer may ask for. The dispatch fee and job cost are paid by you on the day.
In Midway
Utah's traction law covers roads throughout Wasatch County, including US-40, during severe winter storms, requiring vehicles to carry snow tires, chains, or another approved traction device. (Traction Law — UDOT Wasatch Back) That same Heber City climate station's January normals show an average high of 36.5 degrees Fahrenheit against an average low of 12.5 degrees Fahrenheit, a swing of about 24 degrees that puts exposed pipes and fittings through a freeze-thaw cycle on most winter days. (NOAA NCEI U.S. Climate Normals 1991-2020 (Monthly) — Heber, UT)
Calls come from around Deer Creek, Soldier Hollow, Homestead Crater.
Every job 24/7 Express Handyman Service takes on is under $3,000 including labor, materials and any change orders (Utah Code §58-55-305); a change that would push a job over that line is referred to a licensed contractor, not written up as a second job. plumbing, electrical, HVAC, gas appliance / combustion system work is referred to a licensed trade.
Sources
- Requirements for Attaching Plywood for Window Protection - Pinellas County — retrieved 2026-09-23
- NOAA NCEI U.S. Climate Normals 1991-2020 (Monthly) — Heber, UT — retrieved 2026-09-19
- Severe Weather 101: Hail Basics - NOAA National Severe Storms Laboratory — retrieved 2026-09-23
- Fact Sheet 3.2: Wall Systems and Openings - FEMA P-2181 Hurricane and Flood Mitigation Handbook for Public Facilities — retrieved 2026-09-23
- Traction Law — UDOT Wasatch Back — retrieved 2026-09-19