Defensible space in East Bench
Tom Hanks, owner, 24/7 Express Handyman Service · Updated September 2026
24/7 Express Handyman Service clears defensible space in East Bench. 30 feet around buildings is the minimum area USU Extension says to clear of excess brush and small trees. (Firewise Landscaping: The Basics | USU Extension Forestry) 77% of housing in Salt Lake City's East Bench community was owner-occupied as of the 2010 Census, compared with 49.7% citywide. (East Bench Master Plan (Salt Lake City Planning Division, 2017)) In the Salt Lake City & Millcreek zone, scheduled work is $95/hour with a 2-hour minimum and no dispatch fee, plus a $15 fuel surcharge.
How much does a defensible space job cost in East Bench?
From $205
Defensible space in East Bench starts at $205: the 2-hour minimum at $95/hour ($190) plus the $15 fuel surcharge, with no dispatch fee. Time past 2 hours is billed in 30-minute steps. Larger parts are billed at cost plus 25%.
Call now
Salt Lake City & MillcreekAnswered 24/7 by Tom or his dispatcher.
Dispatch fee $199–$349 by time of day, due on arrival, covering the first hour on site. After that, $150/hour in 30-minute steps. Fuel surcharge $15. Supplies fee $50. Full price sheet and estimator
Typical arrival in the Salt Lake City & Millcreek zone: 60–90 minutes.
24/7 Express Handyman Service confirms the address, the zone rate and the dispatch fee, and takes a card, before rolling.

What 24/7 Express Handyman Service does on site
- Cuts dead grass, weeds and brush and rakes up leaf and needle litter in the first 30 feet around the house.
- Pulls bark mulch, dead plants and stored combustibles back from the foundation and swaps bark for gravel on request.
- Trims low, dead branches reachable from the ground or a short ladder and hauls all cut material away.
How it works
- The yard is walked with the homeowner, or reviewed from photos, to mark what stays, what goes and where debris is hauled.
- The cleanup is priced in writing.
- Work moves from the house outward: the first 5 feet, then out to 30 feet, then any extra area agreed on.
- Referred out: tree work near power lines or above ladder reach (arborist), pesticide or herbicide application, and irrigation backflow testing or repairs to the potable connection.
What happens next
- The written scope and price come first; photos of the cleared zones and a list of anything referred out follow the visit.
- Photograph the damage before anything is moved and keep every receipt; 24/7 Express Handyman Service provides an itemised invoice your insurer may ask for. The dispatch fee and job cost are paid by you on the day.
In East Bench
Development in the East Bench neighborhood is relatively young and suburban, with larger lots and homes, curving streets and an abundance of cul-de-sacs, a pattern shaped by the steepness of its location on the slope of the foothills. (East Bench Master Plan (Salt Lake City Planning Division, 2017)) Approximately one-third of East Bench neighborhoods developed prior to World War II. (East Bench Master Plan (Salt Lake City Planning Division, 2017)) A scenario magnitude 7 earthquake is estimated to produce an average fault scarp height of 6.1 feet where faulting occurs along the East Bench, enough displacement to cause irreparable damage to any structure built across the scarp. (Maps Show Potential Geologic Effects of a Magnitude 7 Earthquake | Utah Geological Survey) In a scenario magnitude 7 earthquake, landsliding would likely be most severe on Wasatch Range mountain spurs, threatening downslope development such as the East Bench, although prehistoric landslide deposits on these slopes are relatively rare. (Maps Show Potential Geologic Effects of a Magnitude 7 Earthquake | Utah Geological Survey) Salt Lake City's wildland urban interface code adds fire safety rules for properties near undeveloped natural areas, covering building and roofing materials, how buildings are built, landscaping, and the space required between buildings and wildland. (SLC Wildland Urban Interface Fire Code | Salt Lake City Council Office)
Calls come from around Foothill Drive, Parley's Way, Bonneville Shoreline Trail.
Every job 24/7 Express Handyman Service takes on is under $3,000 including labor, materials and any change orders (Utah Code §58-55-305); a change that would push a job over that line is referred to a licensed contractor, not written up as a second job. plumbing, electrical, HVAC, gas appliance / combustion system work is referred to a licensed trade.
Sources
- Firewise Landscaping: The Basics | USU Extension Forestry — retrieved 2026-09-23
- East Bench Master Plan (Salt Lake City Planning Division, 2017) — retrieved 2026-09-23
- Ask an Expert: Wildfire Safety Starts at Home | USU Extension — retrieved 2026-09-23
- Maps Show Potential Geologic Effects of a Magnitude 7 Earthquake | Utah Geological Survey — retrieved 2026-09-23
- SLC Wildland Urban Interface Fire Code | Salt Lake City Council Office — retrieved 2026-09-23